EFFICIENTAIR
EFFICIENTAIR
HVAC ENERGY SAVING SOLUTIONS
TEL: +44 (0)1825 748150 FAX: +44 (0)1825 748151
E-MAIL: sales@efficientair.co.uk
PROJECT VERIFICATION
We verify the amount of energy saved on each project by installing GSM based remote monitoring to collect pre and post energy and performance data. The collected data is web hosted so that the customer can view in real time the step change in energy consumption following the installation of new high efficiency air movement technology. The post review of energy and system performance data can also help to identify and quantify other energy saving wins if the system is further optimised.
The graph illustrates typical before and after data following an air movement upgrade to a close control air conditioning unit serving a Data Centre.
Existing Clients
Please type in email your email address and password
to login and view current projects being monitored.
Please email us if you are unable to login at info@efficientair.co.uk
Efficient Air Ltd. The Roller Mill Mill Lane Uckfield East Sussex TN22 5AA Tel: +44 (0)1825 748150 Fax: +44 (0)1825 748151 Designed by The Cracking Good Design Co.